SB205
Industrial Stormwater Compliance Flow Chart
Does your business require a WDID, NEC or NONA to comply with California stormwater requirements?
1) Does your business operate under any of these Standard Industrial Classification (SIC) codes or is included IGP Attachment A?
Yes – Continue to step 2
No – Apply for a Notice of Non-Applicability (NONA) identification
2) Are business operations exposed to stormwater?
Yes – Continue to step 3
No – Apply for a No Exposure Certification (NEC) identification number
3) Apply for a Waste Discharger Identification (WDID)
Submit a Notice of Intent (NOI) via the SMARTS database to apply for a WDID number
4) Submit your WDID, NEC or NONA number to your city/county to complete the business license application.
Need Stormwater Help?
Call us at (833) 420-7761 or click the button below to schedule a FREE, no-obligation assessment from a Stormwater Pro.
Useful Links
FREE CONSULTATION
Start with Stormwater Pro
SERVICES
- Stormwater Pollution Prevention
- Plans (SWPPP)
- Level 1 and Level 2
- Exceedence Response Actions
- Technical Reports
- Rain Event Action Plans (REAPs)
- Inspections
EXPERTS
- Qualified SWPPP Developer (QSD)
- Qualified SWPPP Practitioner (QSP)
- Qualified Industrial Stormwater
- Practitioner (QISP)
- Staff Training
- BMPs
- Caltrans WPCM
COMPLIANCE
- Stormwater Evaluation
- No Exposure Certifications (NEC)
- Notice of Non-Applicability (NONA)
- Construction General Permit
- Industrial General Permit
- Multi-Sector General Permit
- Notice of Violation